Boston College
Schiller Institute for Integrated Science and Society
Location
Newton, MA
Project Contributors
Payette, Suffolk Construction
Mott Solutions
- Optima™ Benches
- Mobile & Fixed Steel Cabinets with Red Oak Fronts
- NovaGuard™ Fume Hoods
- Crank Tables
- Mobile Tables
This project-based research space is highly flexible to reconfigure as tasks, procedures and users change. The labs are open with height adjustable Optima™ benches and tables, modular mobile casework and quick-disconnect overhead utilities. All fixed elements - sinks and NovaGuard™ fume hoods—are placed around the perimeter to maximize the flexibility of the lab.